Geneva National, Lake Geneva, WI · Completed 2022 · Primary bath remodel · $30,000 to $35,000
The project
This Geneva National primary bath still had its original corner jetted tub, oak vanity and builder-grade finishes. We took the room down to the studs and the subfloor and rebuilt it.
Done right underneath
With the walls and floor open, we reframed where needed and fixed what was hidden before any new finishes went in, so the new bath is built on a solid base. The new shower was fully waterproofed before tile.
What we built
A walk-in shower in large marble-look tile with a black hex-tile niche, a grab bar and a mosaic floor. The corner tub got a new dark stone surround under the windows, and a new double vanity with dark cabinets, a light top and new lighting finished the room.
Planning something similar? Call or text us at 262-716-6663 to set up a visit.
Built once, built right, built for generations. Elite Improvements.
















